There were two reasons we put the floor down.

1. The roof was leaking and the water could run under the floor to a
drain about 6-8 feet from the bathroom door. The roof does not leak
anymore.

2. The floor was not level. It sloped towards the drain. The slope
increased around the drain. The raised floor was level, because we put
shims under it to level it. (And to let water flow under the supports.)

Kip


On Tue, 2007-10-30 at 20:53 -0600, Eric Sumner wrote:
> > The warehouse has gotten a little messy lately, so we'll be doing some
> > cleanup at tonight's RBNO. Come on down and help out.
> 
> About 15 people showed up today, and most of them were still busily
> working when I left around 9:00.  All of the machine tools have been
> relocated into the front room, and a lot of the junk has been disposed
> of.  As I was leaving, some unused items were being moved to storage
> to give us that much more room.
> 
> There has been some talk about pulling up the raised floor; does
> anyone actually remember what the floor underneath is like?
> 
>   -- Eric Sumner
> _______________________________________________
> DPRGlist mailing list
> DPRGlist at dprg.org
> http://list.dprg.org/mailman/listinfo/dprglist
> 
-- 
Kipton Moravec KE5NGX
"Always do right; this will gratify some people and astonish the rest."
--Mark Twain